Project setup reference¶
The facts behind the tasks for setting up and keeping a project. Each task page links here once; the steps stay on the task page.
Coordinate system¶
The coordinate system is the grid the survey was delivered on, not a choice of how the map looks. Use the code the survey states, not a convenient nearby grid.
- What is accepted. Any EPSG code in the registry GISweaver works from. A code that is not in the registry is refused under the box.
- Where the box starts. On your organisation's usual grid: the first grid listed for its country, such as 27700 for the United Kingdom or 32639 for the United Arab Emirates. With no country on record, or a country with no grid listed, the box starts empty.
- What the list offers. The grids for your organisation's country first, then a short list of common grids and EPSG:4326 for a delivery stated in degrees. Typing finds any other system a project can be created on.
- Exact measurements and corridors. The exact-measurement editor works on EPSG:32643 (WGS 84 / UTM zone 43N) and on WGS 84. Corridors work on EPSG:32643 only. On any other grid the project is created, a line under the box says Exact measurements are off on this grid., and those two tools stay off.
- Changing it. You can correct the grid until the project holds a map file, a release or an upload in progress. The stored data is in that system.
- Other systems in a file. A point cloud recorded in another system is shown reprojected, with a note on its file.
What the grid changes¶
- The project's header names the system, for example OSGB 1936 / British National Grid (EPSG:27700).
- Distances and areas on the map are measured on that grid.
- An export's plan-sheet grid and coordinate schedule use the grid's own eastings and northings, in its own unit (m, ft or US ft).
- Measurements still read in the units you choose in the workspace.
- For a grid in feet, the Coordinates panel shows no grid reading, because it writes grid values in metres only. Decimal degrees stay available.
- Some older national grids are listed but measured in degrees. Check the export before you deliver.
The project number¶
The number is how your organisation refers to the work. A number GISweaver gives has the form branch code, year and three digits, such as SITE-2026-012; the first project of a new year starts again at 001.
- Length. 1 to 64 characters.
- Unique. No other live project may use it; archiving a project frees its number.
- Search. The search box on Projects finds a project by any part of its number or name, so "2026" finds every number containing 2026.
- Changing it. The number can be changed later; tell colleagues who quote the old one.
The About this project card¶
- Assigned. A summary: the first names, and Who can see this project, which leads to the project's Access tab. People are assigned there, not in the card's editor.
- Contact. A short line for reaching someone on the job, such as "Site: A. Surveyor, +00 0000 0000 (weekdays 8–5)", up to 500 characters. Everyone who can open the project reads it, so leave out anything confidential.
- Links. Websites such as a tender portal or a drawing set; each opens in a new tab. A file belongs in the Files list, and so does a link the team wants to discuss; see Keep a link with a project.
- Client and picture. Picture saves in its own editor and Client with Save details. Read, the card shows the client's name, and the picture appears in the header.
- Who edits. Owners, administrators, the branch's manager and the project's lead. Anyone else reads the card; an empty card says No details yet.
- On a phone. The card folds to one line under the project's state. Tap it to read the whole card, then select Edit. The picture is set on a larger screen.
The project picture¶
- Initials. The first letters of the first two words of the name ("Riverside survey" is RS), or the first two letters of a one-word name ("Harbour" is HA). A name with no letters shows the letters of the number. Each project keeps the same colour on every screen.
- Cropped here. The picture is cropped in your browser, so only the part inside the frame is sent.
- Camera information. GISweaver resizes the picture and saves it afresh, which discards any camera information, including where a photograph was taken.
- Who sees it. Only people who can open the project.
- How long it stays. Through the project's restore period; it is deleted when the project is deleted permanently.
- Taking it away. Remove under the picture puts the initials back.
Clients¶
A client is the customer the survey work is for. Owners and administrators write clients down once, under Clients. A project's lead or a branch manager picks from that list and sees only the clients' names, not their contact people, phone numbers or tax numbers.
The card has one save: it saves the client if you changed it, then the details. If either cannot be saved, the card stays open and nothing you chose is dropped; Cancel discards both. A client connected to its own GISweaver organisation is told once, the first time a project names it.
Assigned people¶
Assigning says who is responsible; it gives no access. The dialog offers only people who can already open the project. To let somebody else in, see Give a colleague access to a project and Who can see a project. A project can have at most 50 people assigned.
Who can archive¶
| Role | Can archive |
|---|---|
| Owner, Admin | Any project |
| Branch manager | A project they opened themselves, for as long as nothing has been added to it: no file, no release, no survey object, and no upload under way |
| Anyone else | No |
Bringing an archived project back, and deleting one, stay with owners and administrators. An archived project keeps its files, releases and history; deleting it goes through the steps of any other deletion.
The restore period¶
The Delete panel says how long a deleted project can be restored. The restore-by date is fixed when you delete the project; if the period changes later, a project already deleted keeps its date. Every deletion and restore is recorded in your organisation's audit trail, with the project's number and your comment.
The Activity tab¶
Each tab of a project has its own address, so you can send a colleague straight to its Activity. The tab shows the same entries as your organisation's audit trail, narrowed to this project.
Limits on a file¶
Your plan sets how large one file may be, how many uploads your organisation may make a month and how much storage it holds. A grant made for your organisation can raise the limit; the number on the drop strip and on Billing already includes it. A file that would go past a limit is refused with You have used up your plan’s uploads this month. or a sentence about storage.
A kept file (a PDF, a photo, a video or an archive) is held to the limit for one file like every other file, and its size is set aside from your storage when the upload starts.
Publishing a Draft stores no extra copy: a release keeps the files it was made from, and a file counts towards storage once however many releases hold it. Publish is never refused for storage. A release published before 20 October 2026 keeps its own copies, counted, until you remove its files from storage.
Words¶
A release is a published version of the project's survey, fixed once published, and what you deliver. A delivery is a release handed to another organisation. A kept file is a photo, PDF, video or archive kept with the project as it came. A thread is a conversation about one file, feature or message. Other words are in the glossary.